Beginning April 23, 2024, functioning of api.gdeltproject.org was checked 5 times over the next 220 days. As of November 4, 2024, api.gdeltproject.org responded with a 200 status code and was accessible 5 times out of the total checks that were made. As of November 29, 2024, every inspection of api.gdeltproject.org indicated that there were no offline periods. No responses with an error status have been reported as of November 29, 2024, according to all received replies. Averaging 0.276 seconds, api.gdeltproject.org had a response time of 0.227 seconds on November 4, 2024.